About pricing
Looking for an exact price?
See indicative rangesThe figures on each machine are real and they are the ranges we build within. What they can't tell you is where your machine sits in that range, because that depends on what you're packing.
A four-head linear weigher for 500g of granola and one for 20 litres of whole bean coffee are different builds — different hopper volume, different feed rates, different gate timing. Change the product to a fine powder and it isn't a weigher at all, it's an auger filler.
What determines the price
-
Product characteristics
Free-flowing, cohesive, fragile, oily, abrasive or static-prone. This determines the machine class before anything else.
-
Volume and throughput
Target weight and units per minute set head count, hopper size and drive specification.
-
Build specification
Contact material and grade depend on the product, contact areas and washdown regime. 304 and 316 stainless are both used across the range; higher-corrosion conditions such as salt, acid or aggressive washdown typically move the build to 316, which costs more. The grade for your build is confirmed during specification.
-
Format and tooling
Pouch style, film type, zipper, valve, gas flush and coding method each carry their own tooling.
-
Hazardous area classification
Combustible dusts such as protein powder, flour, sugar, cocoa and milk powder can raise hazardous-area requirements — earthing, antistatic filters and certified components among them. The applicable classification depends on the dust, the installation and the destination market; across our primary markets of Australia, New Zealand, Singapore, Malaysia and Indonesia this is assessed against the relevant local requirements, with frameworks such as ATEX or the IECEx scheme applying only where a specific destination or export market calls for them. This is established during specification, changes the price where it applies, and is not optional where the classification demands it.
Indicative pricing by machine category
| Machine | Group | Systems built to | Entry configuration from |
|---|---|---|---|
| Linear weighers | Weighing | Systems built toUSD 60,000 | Entry configuration fromUSD 6,500 |
| Multihead weighers | Weighing | Systems built toUSD 140,000 | Entry configuration fromUSD 22,400 |
| Checkweighing and metal detection | Inspection | Systems built toUSD 30,000 | Entry configuration fromUSD 12,800 |
| Auger fillers | Filling | Systems built toUSD 45,000 | Entry configuration fromUSD 19,200 |
| VFFS baggers | Bagging and sealing | Systems built toUSD 105,000 | Entry configuration fromUSD 35,200 |
| Premade pouch machines | Bagging and sealing | Systems built toUSD 155,000 | Entry configuration fromUSD 25,600 |
| Conveying systems | Product handling | Systems built toSystems to USD 50,000+ | Entry configuration fromSingle units from USD 3,000 |
Figures are indicative and confirmed by quotation, which sets out the final specification and the applicable delivery and project scope for your destination. Figures shown in currencies other than USD are an indicative conversion and may differ from the figure on your quotation.
Compare quotations on the same basis
Use the same product, pack and output brief for each quotation. Mark each item as included, priced separately, supplied by you or still to be agreed.
- Machine and format. Machine configuration, tooling and change parts for each pack.
- Line interfaces. Feeding, conveyors, controls, guarding and services needed at the site.
- Delivery and handover. Delivery scope, installation, commissioning, operator training and agreed documentation.
- Performance. Product and pack assumptions, sustained output, and how acceptance will be assessed.
- Ongoing operation. Maintenance, spares, warranty and support arrangements for your site.
Send the product, target weight, pack sizes, required output and the equipment you want to keep. Include the destination and a layout if you have one.
Discuss the scope of your projectA price for your application
Tell us what you're packing, at what target weight, in what format and at what rate. That's enough for a configuration and a firm price, usually within two working days — a short email, not a sales process.